THE FUTURE OF FIBER SECONDARY COATING LINE TECH

Intermittent Bonded Ribbon Production Line For Sale

A specified speed of 600 m/min gives this equipment considerable production capacity for optical-fiber applications. Prospective buyers should confirm the achievable speed, machine setup, and required operating conditions directly with the manufacturer before proceeding.

Shanghai Weiye OFC supplies equipment designed specifically for producing rollable ribbons containing 12 or 16 fibers. Its product description presents the equipment’s capabilities, technical specifications, and included systems, providing U.S. buyers with a basis for comparing their equipment requirements.

Review the listed configuration in the product description, then contact the supplier about pricing, installation, and options specific to your project. Doing so can clarify which specifications and options are relevant to your facility and production objectives.

Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. provides its business address as 201 Minyi Road, Songjiang District, Shanghai. Consider the product listing a preliminary information source, and confirm up-to-date specifications and commercial terms with the supplier. A detailed quotation request can help advance your equipment evaluation.




Important Points To Consider

  • A speed of 600 m/min is listed, but buyers should verify the operating conditions with the manufacturer.
  • This equipment supports production of 12-fiber and 16-fiber rollable ribbon formats.
  • Information about equipment functions, specifications, and included systems appears on the product page.
  • Ask the supplier to clarify costs, installation arrangements, and requirements unique to your project.
  • A company address in Shanghai’s Songjiang District is included in the supplier information.

Intermittent Bonded Ribbon Production Line Overview

According to the supplier, the equipment is designed for rollable IBR configurations containing 12 or 16 fibers. The published specifications state a 600 m/min construction speed together with a fiber diameter of Ф245 μm ±10 μm. As these are manufacturer-listed values, confirm the actual production speed and relevant operating requirements directly with the supplier.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Designed To Produce Twelve- And Sixteen-Fiber Rollable Ribbons

Two fiber-count options are supported by the configuration for manufacturing rollable ribbons. Buyers can use these options as a starting point for checking compatibility with target formats, fiber sizes, and handling requirements.

How Intermittent Adhesive Bonding Allows Flexible Fiber Configurations

The patent’s design examples describe neighboring fiber subunits joined by adhesive bonds positioned at intervals. The patent provides an example of adhesive-bond intervals ranging between 10 mm and 1,000 mm. This differs from a continuously bonded structure in which the connection extends across the full ribbon length.

By spacing the bonds apart, the assembly can move between a mostly planar arrangement and a rolled, curled, or folded shape. The specified spacing illustrates the patented design concept rather than confirmed production-machine settings.

  • Machine details: A choice of 12 or 16 fibers, a listed operating speed of 600 m/min, and a specified diameter of Ф245 μm ±10 μm.
  • Patent example: Adhesive-bond intervals ranging from 10 mm to 1,000 mm.
  • Design benefit: Adaptable handling when the ribbon takes different shapes.

Uses In Optical Fiber Cable Manufacturing

Adjustable fiber layouts may allow cable designers to combine convenient splice access with space-efficient packaging. The patent outlines a configuration that maintains fiber organization while allowing portions to move between adhesive connection points during cable assembly.

Compact Cable Designs And High Fiber Density

An optical fiber ribbon may remain flat during mass fusion splicing and subsequently fold or roll for installation in a smaller cable. The patent identifies opportunities for reduced cable dimensions and a greater proportion of fiber area relative to the cable’s cross-sectional area. The results achieved in practice depend on the complete cable construction and its intended use.

Organizing Fiber Ribbons To Support Efficient Fusion Splicing

This design supports orderly fiber handling during splicing while providing flexibility for subunit movement in the assembly process. For production material planning, the listed specifications include payoff reels accommodating 25.2 km and 50.4 km of fiber. Buyers can evaluate these capacities against their production requirements and existing handling arrangements.

Design characteristic Potential use Buyer consideration
Flat fiber configuration Mass fusion splicing Verify the needs of your splicing process
Ribbon configuration that folds or rolls Compact cable packaging Examine the complete cable design
25.2 km and 50.4 km capacity payoff reels Material-handling preparation Align reel capacities with operating needs

Production Line Specifications And Performance

Compare the equipment’s published performance figures with your manufacturing requirements before requesting a quotation. Installation preparations should also account for suitable reels and the utilities available at the production site.

Speed, Diameter, And Attenuation

According to the specifications, the construction speed reaches 600 m/min. The specified fiber diameter is Ф245 μm ±10 μm, while additional attenuation is stated as ≤0.01 dB/km at 1550 nm. Confirm the measurement conditions and expected performance directly with the manufacturer.

Compatibility With Payoff And Take-Up Reels

The payoff system accommodates two reel dimensions, and the maximum weight of a full reel is 10 kg. The take-up assembly supports a T-type reel as well as a fiber-optic reel. Verify that your selected reel configuration is compatible with the facility’s material-handling process.

Facility Utilities And Operating Environment

The machine requires a three-phase, five-wire electrical supply rated at 380 V ±10%. The equipment should operate in an enclosed, clean, dry, draft-free area maintained at 15 to 25°C and a maximum relative humidity of 85%. Utility requirements also include nitrogen at 7 bar and 99.99% purity, plus a compressed-air supply at 6 bar. Check all utility connections in advance of installing the equipment.

Specification Published requirement Planning note
Reels for fiber payoff Ф236 × Ф25.4 × 108 mm; Ф267 × Ф25.4 × 180 mm; maximum full-reel weight ≤10 kg Check reel compatibility and maximum weight
Reel used for take-up T-type dimensions of Φ410 × Φ50.8 × 391 mm, or a fiber-optic reel Confirm compatibility with your selected format
Power and environment 380 V ±10%; 15 to 25°C; relative humidity ≤85% Provide a clean, dry area without drafts
Gas utility supply Nitrogen at 7 bar and 99.99% purity; compressed air at 6 bar Verify gas supply capacity before installation

Fiber Payoff And Gathering Equipment

The payoff and gathering assemblies direct optical fibers into the ribbon-forming area. Their control systems support consistent feeding and help protect individual fibers throughout handling.

Sixteen-Spool Payoff With Tension Control

The payoff assembly holds 16 spools and provides traversing along with separately adjustable tension settings. The permitted weight for an individual spool is up to 10 kg. Detailed specifications indicate a tension range of 0.4 to 2 N, accuracy of ±0.02 N, and a 550 W motor. Another overview gives a range of 40 to 150 g and accuracy of ±2 g, so buyers should confirm which specification applies to their configuration.

Fiber Guiding, Break Detection, And Electrostatic Control

The forming area receives fibers through U-groove guides, multi-groove gathering rollers, and devices designed to prevent jumping. Operators receive alerts about fiber problems through break detection and alarm functions. Protective guards and pneumatic clamping provide additional support for safe material handling. A rod-type electrostatic dust collector is positioned at the fiber exit, and additional anti-static devices help control dust throughout the gathering path.

Component Listed detail Intended function
Fiber payoff assembly Capacity for 16 spools, each weighing up to 10 kg Feeds optical fibers with traversing movement
Tension and motor Tension of 0.4 to 2 N, accuracy ±0.02 N; motor rated 550 W Maintains controlled fiber payoff
Fiber guidance and safety features Rollers with grooves, warning alarms, protective guards, and a pneumatic clamp Guides fiber movement and assists material handling
Electrostatic management Rod-style electrostatic collector with anti-static devices Helps reduce dust near fiber routes

Precision Molding And Intermittent Adhesive Dispensing

The ribbon-forming platform allows operators to control the mold position and placement of adhesive. These settings allow the production process to be adapted to the intended ribbon configuration.

Adjustable IBR Mold Platform For Ribbon Formation

Ribbon formation uses three mold assemblies, each capable of holding up to five Nordson EFD jet valves. The mold adjustment range extends from 0 to 15 mm, while the mold base can be maintained between 20°C and 60°C. Precision valve groups mounted on sliding tables allow fine positioning and accurate application of adhesive dots.

Configurable Nozzle Arrangements For Twelve- And Sixteen-Fiber Ribbons

For 12-fiber ribbons, the specified arrangement consists of 5+5+1 valves. Production of the 16-fiber format uses a 5+5+5 configuration. Operators can adjust adhesive-dot spacing and the number of dots through the interface to match the selected optical fiber ribbon design. A dedicated adhesive is required for the coating and curing stages.

Setting Format With 12 Fibers Format With 16 Fibers
Dispensing valve layout 5+5+1 valve configuration 5+5+5 valve configuration
Mold adjustment 0 to 15 mm adjustment 0 to 15 mm adjustment
Temperature of the mold base 20°C to 60°C operating range Temperature range of 20°C to 60°C

UV-LED Curing For Bonded Fiber Ribbons

Adhesive across the fiber assembly is cured through a sequence of UV exposure stages. Prospective buyers can assess the oven configuration and listed operating specifications to determine whether the equipment suits their production process.

Initial Pre-Curing And Main Curing Operations

Pre-curing is handled by three specialized 800 W LED-UV ovens. Each oven processes fibers supplied by a separate mold group before the material reaches the main 6 kW post-curing oven. The system uses adjustable shutters to help contain UV exposure and minimize nitrogen losses. Published specifications identify a dominant wavelength of 395 nm ±3 nm, a curing degree of at least 85%, and post-curing power of at least 2.5 kW.

Nitrogen Management And Curing Performance

The nitrogen flow rate and pressure can be adjusted by hand. Automatic functions also start nitrogen delivery during startup and stop it at shutdown. At production speed under continuous stable conditions, the specified lamp-array power consumption is no more than 80% of total power. These specifications provide a reference for comparing equipment, although testing conditions should be verified with the supplier. Discuss how the operating settings may change depending on the adhesive and materials selected.

Visual Monitoring, Capstan, And Take-Up

As fibers travel through the equipment, visual monitoring and steady winding support the maintenance of material quality. Buyers can use the listed specifications to assess whether the machine meets the demands of their cable manufacturing process.

Real-Time Inspection Of Fiber Colors And Adhesive Dot Placement

A microscope and camera provide enlarged images in real time. The display allows operators to check the sequence of fiber colors and confirm adhesive resin dots at each dispensing position. This inspection helps identify ribbon problems before the material enters the winding stage.

Servo-Driven Traction And Precision Take-Up

A 1 kW AC servo motor powers the capstan’s Φ190 mm traction wheel. Metering accuracy is specified as better than 1‰. Operators can set tension between 50 and 500 g while maintaining an accuracy of ±5 g. These operating parameters help maintain careful fiber-ribbon handling as the material advances through the line.

The specified take-up speed is 600 m/min, and the maximum spool weight is 30 kg. Servo-controlled winding and traversing systems help maintain consistent material placement. Cable pitch can be adjusted continuously between 1 and 6 mm. Position detection and direction changes are supported by a photoelectric sensor. Check the intended cable requirements and actual operating conditions with the manufacturer.

Production Monitoring And Electrical Control Systems

Accessible controls allow operators to adjust settings, check equipment status, and arrange orderly shutdowns. According to the manufacturer, the machinery incorporates Siemens controls alongside Schneider Electric switchgear.

Operating The Production Line Through PLC And Touchscreen Controls

Siemens S7-1200 and S7-1500 PLCs manage the ribbon manufacturing system through a 10.4-inch Siemens touchscreen. Schneider Electric provides the low-voltage switching equipment. Operators may control the entire line with interlocked units or run individual sections independently.

Settings, Alarms, And Length-Based Stops

The touchscreen allows adjustment of process parameters, curing-oven activation, wire-feed settings, and alarm information. It also displays lamp operating hours, live lamp current, oven temperature, and the equipment’s accumulated operating time. The meter-counter calibration feature allows displayed counts to be aligned with the distance actually traveled.

Operators can program a target production length that triggers deceleration or shutdown. The function supports managed stopping as a cable manufacturing run reaches its planned length. Ask the manufacturer to confirm control capabilities and setup requirements before placing an order.

Control feature Listed detail Use
PLC controls and operator display Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch touchscreen Adjust and review operating information
Electrical control components Low-voltage switchgear from Schneider Electric Provides support for system control
Monitoring and stopping Operating data for lamps, ovens, runtime, and meters; preset-length function Monitor production and stop or decelerate the equipment

Materials, Process Compatibility, And Ribbon Quality

Adhesive selection affects both the consistency of coating application and the final product. The manufacturer calls for a specialized adhesive intended for the machine’s coating and curing process instead of an ordinary multipurpose product.

Specialized Adhesive Used For Bonding And Curing

The pressure-fed adhesive system provides independent valve switches so each supply path can be opened or closed as required. Adhesive flow to each dispensing point is managed using precision pressure-control valves. The specified air pressure is adjustable, with a required minimum of 0.5 MPa.

Black adhesive supply tubing helps protect the material from reactions caused by UV exposure during operation and curing. This protection is important because premature exposure may change adhesive properties before application to the fiber.

Confirm suitable adhesives, process parameters, and surface-finish requirements with the manufacturer before choosing materials for a secondary coating operation. Discuss the material’s expected performance across your planned application and run duration. Clear process instructions can help maintain quality from initial setup through final production.

Equipment Installation Needs And Supplied Documentation

Ensure the workspace and utility supplies are ready before scheduling the machine’s installation. The manufacturer’s stated requirements help buyers prepare their facilities and maintain stable operation of the optical fiber equipment.

Required Facility Conditions And Connections Provided By The Buyer

Install the machinery in a clean, dry, enclosed environment protected from drafts. Maintain a room temperature of 15 to 25°C and relative humidity no higher than 85%. Provide nitrogen at 7 bar and 99.99% purity, along with compressed air at 6 bar.

The equipment package does not include connecting cables or cable trays. The purchaser is responsible for supplying the main incoming power cable. Before installation, check cable routing and utility capacity, particularly when the machine will be located near secondary coating operations.

Documentation For Operation, Installation, And Maintenance

The supplier includes documentation supporting machine installation, operation, and servicing. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.

  • Operating and instruction manuals together with the overall equipment layout drawing
  • Electrical schematics, wiring diagrams, and drawings for installation and maintenance
  • Manuals for purchased parts and a list of wear parts for maintenance planning

The supplied records support preparation for commissioning and routine servicing of the cable production machinery.

Choosing A Ribbon Production Line For Your Manufacturing Needs

First determine which finished ribbon products your business plans to offer. This production line is designed for 12F and 16F options, with a listed construction rate of 600 m/min. Compare those specifications with your expected product mix, production targets, and anticipated cable demand.

Before purchasing the machine, confirm that its take-up arrangement matches your requirements. The standard IBR reel has dimensions of Φ410 × Φ50.8 × 390 × Φ310 mm, supports up to 30 kg, and provides cable pitch adjustment from 1 to 6 mm. Confirm that the listed reel dimensions, capacity, and pitch range are appropriate for your site and handling process.

Payoff reel compatibility also deserves attention. The listed choices include internationally standardized spools with capacities of 25.2 km, 50.4 km, and 63 km. Obtain the exact spool dimensions before ordering materials or planning the length of manufacturing runs.

Evaluate utilities, adhesive requirements, and operator-monitoring capabilities alongside production speed. For cable manufacturing, determine whether the configuration suits fiber cable, loose tube, or another planned application. Before ordering, review equipment configuration and startup requirements directly with Shanghai Weiye. A thorough compatibility assessment can help prevent expensive modifications later.

Planning point Manufacturer-listed specification Required buyer verification
Ribbon configurations and operating speed 12F, 16F; specified speed of 600 m/min Match the specifications to manufacturing goals and product range
Take-up configuration 30 kg maximum capacity; adjustable pitch from 1 to 6 mm Check reel compatibility and facility requirements
Fiber payoff reel options 25.2 km, 50.4 km, and 63 km spool capacities Verify exact spool dimensions

How To Request A Quotation For The Intermittent Bonded Ribbon Production Line

U.S. buyers can evaluate a system offering 12F and 16F formats, a specified construction rate of 600 m/min, and specialized optical fiber ribbon-forming equipment. Use these specifications to determine whether the machine is appropriate for your intended cable application.

When requesting a quotation, provide the required ribbon format, expected output volume, preferred reels, and available site utilities. Include information about the fibers and material-handling process to allow Shanghai Weiye to review the intended setup.

Before ordering, verify adhesive compatibility, the specified LED wavelength of 395 nm ±3 nm, and the published curing performance. Ask the supplier how these parameters relate to the chosen materials and required surface quality.

Use the manufacturer’s product listing to examine the equipment information. Verify the final configuration, shipment details, and installation commissioning with Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. The company’s listed address is 201 Minyi Road, Songjiang District, Shanghai. You can call 021-60701630 to review your project needs with the supplier. Providing complete information in your quote request makes the following stages easier to clarify.